
Before During After


Our primary objective is to meet the growing demand for cost effective shoreline erosion repair. Because of past
unrestricted dredging by developers for fill to build upon, shoreline erosion has effected most all developments,
homeowners associations, golf courses, and private residences throughout the southern United States.
The South Florida Water Management District (SFWMD) has "set the standard" regarding the installation of ALL methods of erosion repair. Studies have shown (see Geo-Tube) that the Geo-Tube system is the most cost
effective long-term option accepted by the SFWMD. Having proven itself over many years.
ASR has decided to focus primarily on the Geo-Tube system.
ASR has a working relationship with engineers from the SFWMD through out the State of Florida. ASR values this relationship and will continue to meet or exceed their specs for the Geo-Tube method of shoreline maintenance.
CALL TOLL FREE: 1-888-753-7633
Concrete Mat |
Riprap |
Bulkhead/Seawall |
Geo-Tube |
|
| Life Span (years) | 35 |
30 |
20 |
20+ Year Life Span |
| Cost Per Linear Foot | $130 |
$150 |
$200 |
FREE on site quotes
Florida Shoreline Restoration
|
| Aestheic Quality | Poor |
Fair |
Fair |
Excellent Aesthetic Quality |